2023 China Telecom Guiyang Branch Old Machine Room Green Energy Saving Transformation Project (Guiyang Black Horse) EPC General Contracting


Industry:

Communication

Party A Name

China Telecom Co., Ltd. Guiyang Branch

Project Area

Guiyang City, Guizhou Province

Equipment Status

1 x 400RT magnetic levitation water chiller, 15 x 100kW chilled water terminal units + AI group control system

Acceptance Date

May 2023

Operating Status

The equipment is currently operating well.

Project Highlights: This project is a core transformation of Guizhou Telecom. Due to the high energy consumption (PUE 1.72) of the old equipment, a magnetic levitation water chiller unit is used to replace the original traditional air-cooled air conditioner. The magnetic levitation unit has high energy efficiency, and due to its oil-free operation and low noise, the energy efficiency after the transformation reaches below 1.402.